Hyperscale · AI Infrastructure
Meta Platforms.
Meta's Hyperion (LA) and Prometheus (OH) mega-campuses represent the largest single announcements in AI infrastructure. Its willingness to co-locate with new gas + solar + storage is remaking Entergy's IRP.
HQ
Menlo Park, CA
Ticker
NASDAQ: META
Employees
72,000
Market Cap
$1.5T
Institutional Scoring
Grid, power, opportunity
Grid Risk — Elevated
Composite risk index
- · Entergy Hurricane restoration exposure
- · AEP Ohio rate design
- · ERCOT winter
Power Availability — Moderate
Firm delivery readiness
Willingness to co-locate generation unlocks capacity others can't access.
Opportunity — High
Institutional thesis
Anchor customer for firm + renewable hybrid capacity — pace-setter for load-serving tariff design nationally.
Analyst AI Summary
Meta is the counterparty most willing to sign co-located gas + solar + storage packages — the LA Hyperion deal is the template. Political risk in Ohio (Prometheus) is the near-term watch item. Longer term, Meta's scale forces Entergy and AEP into multi-billion transmission upgrades that reset those utilities' rate bases.
Executive Hierarchy
Mark Zuckerberg
Since 2004
Chair & CEO
AI capex, product
Susan Li
Since 2022
CFO
Capex, discipline
Rachel Peterson
Since 2010
VP, Data Center Strategy
Portfolio + power
Urvi Parekh
Since 2021
Head of Global Energy
PPA book
Recent News
- 2026-06-30 · ReutersCapex
Hyperion Louisiana campus expands to 2.5 GW
- 2026-06-15 · BloombergRegulatory
Meta and Entergy sign 1.5 GW gas + solar tariff
- 2026-05-09 · Meta IREarnings
Q1 capex $13.7B — AI dominant, FY guide $75B
- 2026-04-22 · S&P GlobalRegulatory
Prometheus OH environmental review underway
Infrastructure Projects
| Project | Status | Capex | MW | State | Online |
|---|---|---|---|---|---|
| Hyperion Louisiana | Under Construction | $10B+ | 2,500 | LA | 2028 |
| Prometheus Ohio | Permitting | $8B | 2,000 | OH | 2028 |
| Temple TX Campus | Under Construction | $1.6B | 400 | TX | 2027 |
| Rosemount MN Expansion | Under Construction | $800M | 250 | MN | 2027 |
Facilities
| Facility | Type | Location | ISO | Utility | Load (MW) | Status |
|---|---|---|---|---|---|---|
| Hyperion Campus | Data Center | Richland Parish, LA | MISO South | Entergy Louisiana | 2,500 | Under Construction |
| Prometheus Campus | Data Center | New Albany, OH | PJM | AEP Ohio | 2,000 | Announced |
| Temple TX | Data Center | Temple, TX | ERCOT | Oncor | 400 | Under Construction |
| Los Lunas NM | Data Center | Los Lunas, NM | WECC | PNM | 300 | Operational |
| Menlo Park HQ | Headquarters | Menlo Park, CA | CAISO | PG&E | 35 | Operational |
Utilities Serving Facilities
Entergy Louisiana
Entergy Corp · serves Hyperion
LPSC approved 2026 special tariff
AEP Ohio
AEP · serves Prometheus
PUCO case pending
Oncor
Sempra · serves Temple
ERCOT direct interconnection
PNM
TXNM Energy · serves Los Lunas
Existing large-load tariff
Substations Nearby
Richland 500kV (new)
Entergy · serves Hyperion
500 kV
0.4 mi
New Albany 345kV
AEP Ohio · serves Prometheus
345 kV
1.1 mi
Temple South 345kV
Oncor · serves Temple
345 kV
2.4 mi
Los Lunas 345kV
PNM · serves Los Lunas
345 kV
1.8 mi
Transmission Proximity
Entergy MISO South 500kV loop
500 kV · 40 miEntergy · headroom 12% (post-upgrade)
AEP 765kV backbone
765 kV · 18 miAEP · headroom 12%
Oncor 345kV central TX
345 kV · 22 miOncor · headroom 18%
Capital Spending
2024A
AI + DC
$39B
2025A
AI capacity
$58B
2026E
Hyperion + Prometheus + AI silicon
$75B
Manufacturing Footprint
Menlo Park, CA
MTIA custom silicon design
Headcount 1,400 · Capacity n/a
ESG Metrics
24/7 CFE regions
6 ▲
Renewable match
100% —
Water positive progress
42% ▲
Scope 3 emissions
8.1 Mt ▲
Energy Consumption Mix
Entergy tariff
Political Exposure
Louisiana PSC
LowTariff approved, supportive
Ohio PUC
ElevatedPrometheus case pending, activism
Texas Legislature
ModerateSB 6 large-load rules
Natural Disaster Exposure
Hurricane
HighLA Hyperion
Tornado
ElevatedOH + TX
Wildfire
ModerateNM + CA HQ
Forward Timeline
- 2026-Q4
Hyperion substation energization
Transmission
- 2027-Q2
Temple TX phase 1 first power
Data Center
- 2027-Q4
Rosemount phase 2 COD
Data Center
- 2028-Q3
Hyperion phase 1 first power
Data Center
Relationship Mapping
Entergy
UtilityHyperion supplier
AEP
UtilityPrometheus supplier
Oncor
UtilityTemple supplier
- NextEra Energy Resources Supplier
PPA anchor
Amazon, Microsoft, Google
CompetitorCompeting for the same MW
Recent SEC Filings
10-Q
2026-04-30Q1 — capex guide raised to $75B FY
8-K
2026-06-30Hyperion expansion disclosure
Procurement Contacts
Infrastructure Procurement
Global DC sourcing
Long-lead equipment
Global Energy
PPA + tariff
Firm + renewable hybrid
Recent Press Releases
Meta Announces Hyperion Expansion
2026-06-30Capex
Meta and Entergy Sign Louisiana Tariff Agreement
2026-06-15Regulatory