ISO / RTO · MODELED TAPE
PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026
SMStock & Milster

ISO/07 · New York State

New York Independent System OperatorNYISO

Climate Act timelines meet downstate constraint geometry.

CLCPA Target

70% by 2030

CHPE Energization

2026

Micron Load

Material

TERMINAL · ISO/07

Operational intelligence frame

LMP HEATMAP · $/MWh · 7D × 24H

MIN $15 · MAX $150
MONTUEWEDTHUFRISATSUN
0006121823
SCALE:LOWMIDELEVATEDSCARCITY

QUEUE AGING · GW

0–1y61 GW
1–2y82 GW
2–3y96 GW
3–5y157 GW
5y+100 GW

Median age: 3.4y · trending +0.6y YoY

TOP CONSTRAINED NODES · 24H

#
Node
LMP
Cong.
Headroom
Δ
1
DOM.WARRENTON
$72
8
25%
-5.0
2
AEP.LIVINGSTON
$113
9
23%
+4.9
3
COMD.JOLIET
$65
38
11%
+4.9
4
BGE.CALVERT
$108
50
4%
+0.8
5
PEPCO.BRANDYWINE
$35
39
31%
-3.6
6
PJM.BLACKOAK
$48
97
20%
+4.3

FERC DOCKET STREAM

ER26-12842026-05-09

Capacity auction parameter update

Tariff
ER26-11902026-05-02

Order 2023 queue reform compliance

Queue
ER26-11122026-04-24

RTEP transmission expansion proposal

Transmission
ER26-10412026-04-18

Affected systems study protocol revision

Process
EL26-08322026-04-09

Cost allocation complaint — load zone

Litigation

ILLUSTRATIVE TERMINAL VIEW · PRODUCTION FEEDS UNDER NDA · REFRESH 5 MIN

Read

NYISO operates the most policy-constrained grid in the country. The CLCPA (Climate Leadership and Community Protection Act) requires 70% renewables by 2030 and zero-emission by 2040 — colliding with downstate transmission limits, indian point retirement aftermath, and rising New York City data center asks.

STRUCTURAL METRICS

LIVE-TRACKED
Footprint
New York State
Peak Load
~32 GW
Climate Act target
70% renewables by 2030
Zone J (NYC) reliance on imports
Material
Long Island offshore wind
Multi-GW pipeline

Constraint Map

Where the headroom is gone.

N/01

Critical

NYC / Zone J

Local capacity requirement; downstate gas peaker retirement pressure.

N/02

Elevated

Long Island / Zone K

Offshore wind landfall + summer peak coincidence.

N/03

Elevated

Hudson Valley / Zone G–H

Indian Point legacy; CHPE in-service reshapes downstate flows.

N/04

Elevated

Western NY / Zone A

Industrial + chip fab (Micron) load; transmission reroute pressure.

Queue Dynamics

Interconnection truth.

Class Year process

Annual cluster study

Public Policy Transmission Need (PPTN)

Active driver of new lines

Offshore wind interconnection

Concentrated on LI / NYC delivery points

Themes

What we are watching.

T/01

CLCPA implementation

Statutory targets set the procurement curve; NYSERDA solicitations execute it.

T/02

Downstate reliability rules

Zone J/K local capacity constructs shape what generation can retire and when.

T/03

Offshore wind reset

Cost increases reshape the procurement architecture; OREC structures evolving.

T/04

Micron mega-fab implications

Upstate chip manufacturing materially shifts forward load forecasts.

Rule Changes & Filings

Recent and pending.

Ongoing

CHPE energization (2026)

1,250 MW Quebec hydro to NYC reshapes Zone J supply stack.

Ongoing

OSW solicitation rounds

NYSERDA pricing reset materially affects developer economics.

Ongoing

DPS / NYISO capacity reform debates

Capacity construct evolution under CLCPA pressure.

Positioning

Why NYISO matters now.

NYISO is the most policy-constrained grid in the country. CLCPA statutory targets, downstate transmission limits, and the Micron upstate mega-fab create a planning problem with no precedent — and a procurement opportunity for capital that can underwrite policy-driven cash flows.

Buyer's Lens

How capital should read NYISO.

Four angles we underwrite against, written for the people actually deploying.
OpportunityB/01

OREC contracts are the bankability layer.

NYSERDA solicitations and the OREC contract structure remain the primary path to financeable offshore wind revenue in the state. The reset rounds are pricing risk more realistically — and that creates entry value.

RiskB/02

Downstate local capacity rules constrain everything.

Zone J and Zone K local capacity requirements determine what generation can retire, what can interconnect, and at what price. Underwriting without a downstate capacity model is not underwriting.

Where Capital WinsB/03

Upstate transmission + Micron-class load.

Zone A around Syracuse / Buffalo carries the Micron-driven load shift. Transmission reroutes and substation reinforcement create coincident infrastructure plays.

What We WatchB/04

CHPE in-service and NYISO capacity reform.

CHPE energization reshapes Zone J supply. Capacity construct reform under CLCPA pressure reshapes everything else.

Deliverables

What we ship on NYISO.

  • D/01NYSERDA Solicitation Calendar & OREC Pricing Pack
  • D/02Downstate Local Capacity Modeling
  • D/03Upstate Transmission Reroute Atlas
  • D/04CLCPA Compliance Path Tracker

Audience

Who uses this read.

  • Offshore wind developers
  • Downstate gas asset owners
  • NYC / LI data center siters
  • Industrial users behind Micron-class load

Engage

Position capital before the NYISO cycle moves again.

Request NYISO Intelligence Pack