ISO / RTO · MODELED TAPE
PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026
SMStock & Milster
All Services
S/02Service Detail

Grid & Power Market Intelligence

Read the grid before you commit to it.

Transmission access, substation proximity, utility territory, load growth, market constraints, power pricing exposure, and interconnection risk — assembled as a single decision surface.

Horizon

45–60 days

Format

Diligence Pack

Cadence

Per-market

Scope

What we examine.

01

Transmission & Substation

Proximity, headroom, planned upgrades, congestion patterns, queue dynamics.

02

ISO/RTO Posture

PJM, MISO, ERCOT, SPP, CAISO, NYISO market structure and capacity dynamics.

03

Utility Territory Risk

Rate trajectory, regulatory posture, IRP signal, demand-charge architecture.

04

Interconnection Risk

Queue position, study timing, network upgrade exposure, withdrawal patterns.

Output

What you receive.

  • D/01Market diligence brief
  • D/02Interconnection risk register
  • D/03Utility-by-utility comparison
  • D/04Transmission proximity heatmap

Best For

Who commissions this.

IPPsSolar & storage developersIndustrial site selectorsCapital allocators

Engage

Ready to scope an engagement?