LDES procurement creates a new asset class.
AB 1373 and CPUC orders are setting multi-GW long-duration storage targets. The first technology platforms with bankable PPAs at scale will define the asset class.
ISO/09 · California (most of)
Duck curve to canyon: storage as the load-following resource.
Storage Installed
13+ GW
LDES Procurement
Multi-GW
EDAM Footprint
Expanding
TERMINAL · ISO/09
LMP HEATMAP · $/MWh · 7D × 24H
MIN $14 · MAX $159QUEUE AGING · GW
Median age: 3.4y · trending +0.6y YoY
TOP CONSTRAINED NODES · 24H
FERC DOCKET STREAM
Capacity auction parameter update
TariffOrder 2023 queue reform compliance
QueueRTEP transmission expansion proposal
TransmissionAffected systems study protocol revision
ProcessCost allocation complaint — load zone
LitigationILLUSTRATIVE TERMINAL VIEW · PRODUCTION FEEDS UNDER NDA · REFRESH 5 MIN
Read
CAISO has become the world's leading test case for a grid built around solar and storage. Battery dispatch now routinely sets evening LMPs. The duck curve has steepened into a canyon. And the next decade's investment thesis hinges on long-duration storage, transmission expansion, and EDAM footprint.
STRUCTURAL METRICS
LIVE-TRACKEDConstraint Map
N/01
CriticalLocal capacity requirement; gas peaker retirement pressure.
N/02
ElevatedHyperscale + industrial; transmission limited north-south.
N/03
ElevatedSolar generation pocket; transmission expansion priority.
N/04
WatchGeothermal + lithium extraction nexus.
Queue Dynamics
Cluster Study process
GIDAP reforms recently implemented
Storage saturation in queue
>80% of new MW
Long-duration storage procurement
AB 1373 / CPUC orders driving
Themes
T/01
California sets the pricing curve, dispatch sophistication, and merchant bankability frame for US storage.
T/02
Multi-GW LDES procurement targets create new asset class economics.
T/03
CAISO day-ahead market extension into PacifiCorp, Idaho Power, BANC reshapes western flows.
T/04
Ignition risk reshapes transmission siting and reliability planning.
Rule Changes & Filings
2024
Filtering speculative queue; raising readiness bar.
Ongoing
Each utility addition reshapes western LMP footprint.
Ongoing
Multi-GW solicitations create LDES market.
Positioning
CAISO is the global test case for a grid built around solar and storage. Battery dispatch sets evening LMPs. The duck curve is now a canyon. The next decade of investment thesis hinges on long-duration storage procurement, EDAM footprint, and transmission expansion.
Buyer's Lens
AB 1373 and CPUC orders are setting multi-GW long-duration storage targets. The first technology platforms with bankable PPAs at scale will define the asset class.
With >80% of new queue MW being storage, evening arbitrage margins are compressing. Dispatch IP and ancillary stacking are the differentiators.
The Salton Sea / Imperial Valley lithium-geothermal corridor is one of the most strategically important nexuses in US infrastructure — and it is still under-allocated by institutional capital.
Each EDAM addition reshapes western LMPs. Each LDES solicitation prints the curve for an emerging asset class.
Deliverables
Audience
Engage
Position capital before the CAISO cycle moves again.