PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026
SMStock & Milster

ISO/09 · California (most of)

California Independent System OperatorCAISO

Duck curve to canyon: storage as the load-following resource.

Storage Installed

13+ GW

LDES Procurement

Multi-GW

EDAM Footprint

Expanding

TERMINAL · ISO/09

Operational intelligence frame

LMP HEATMAP · $/MWh · 7D × 24H

MIN $14 · MAX $159
MONTUEWEDTHUFRISATSUN
0006121823
SCALE:LOWMIDELEVATEDSCARCITY

QUEUE AGING · GW

0–1y46 GW
1–2y77 GW
2–3y95 GW
3–5y134 GW
5y+71 GW

Median age: 3.4y · trending +0.6y YoY

TOP CONSTRAINED NODES · 24H

#
Node
LMP
Cong.
Headroom
Δ
1
DOM.WARRENTON
$37
52
40%
-2.8
2
AEP.LIVINGSTON
$111
79
18%
-4.3
3
COMD.JOLIET
$99
100
20%
-0.7
4
BGE.CALVERT
$61
42
6%
+4.0
5
PEPCO.BRANDYWINE
$63
31
38%
+2.4
6
PJM.BLACKOAK
$65
10
35%
+2.8

FERC DOCKET STREAM

ER26-12842026-05-09

Capacity auction parameter update

Tariff
ER26-11902026-05-02

Order 2023 queue reform compliance

Queue
ER26-11122026-04-24

RTEP transmission expansion proposal

Transmission
ER26-10412026-04-18

Affected systems study protocol revision

Process
EL26-08322026-04-09

Cost allocation complaint — load zone

Litigation

ILLUSTRATIVE TERMINAL VIEW · PRODUCTION FEEDS UNDER NDA · REFRESH 5 MIN

Read

CAISO has become the world's leading test case for a grid built around solar and storage. Battery dispatch now routinely sets evening LMPs. The duck curve has steepened into a canyon. And the next decade's investment thesis hinges on long-duration storage, transmission expansion, and EDAM footprint.

STRUCTURAL METRICS

LIVE-TRACKED
Footprint
California (~80% of state load)
Peak Load Record
~52 GW (Sept 2022)
Battery Storage Installed
~13+ GW
Solar Installed
~20+ GW utility-scale
EDAM footprint
Expanding across West

Constraint Map

Where the headroom is gone.

N/01

Critical

LA Basin / Path 26

Local capacity requirement; gas peaker retirement pressure.

N/02

Elevated

Bay Area / Silicon Valley

Hyperscale + industrial; transmission limited north-south.

N/03

Elevated

Central Valley / Path 15-26 corridor

Solar generation pocket; transmission expansion priority.

N/04

Watch

Imperial Valley / Lithium Valley

Geothermal + lithium extraction nexus.

Queue Dynamics

Interconnection truth.

Cluster Study process

GIDAP reforms recently implemented

Storage saturation in queue

>80% of new MW

Long-duration storage procurement

AB 1373 / CPUC orders driving

Themes

What we are watching.

T/01

Storage as the asset class

California sets the pricing curve, dispatch sophistication, and merchant bankability frame for US storage.

T/02

Long-duration storage procurement

Multi-GW LDES procurement targets create new asset class economics.

T/03

EDAM expansion

CAISO day-ahead market extension into PacifiCorp, Idaho Power, BANC reshapes western flows.

T/04

Wildfire & PSPS overlay

Ignition risk reshapes transmission siting and reliability planning.

Rule Changes & Filings

Recent and pending.

2024

GIDAP interconnection reform

Filtering speculative queue; raising readiness bar.

Ongoing

EDAM go-live waves

Each utility addition reshapes western LMP footprint.

Ongoing

CPUC / CEC LDES procurement

Multi-GW solicitations create LDES market.

Positioning

Why CAISO matters now.

CAISO is the global test case for a grid built around solar and storage. Battery dispatch sets evening LMPs. The duck curve is now a canyon. The next decade of investment thesis hinges on long-duration storage procurement, EDAM footprint, and transmission expansion.

Buyer's Lens

How capital should read CAISO.

Four angles we underwrite against, written for the people actually deploying.
OpportunityB/01

LDES procurement creates a new asset class.

AB 1373 and CPUC orders are setting multi-GW long-duration storage targets. The first technology platforms with bankable PPAs at scale will define the asset class.

RiskB/02

Storage saturation compresses margins.

With >80% of new queue MW being storage, evening arbitrage margins are compressing. Dispatch IP and ancillary stacking are the differentiators.

Where Capital WinsB/03

Imperial Valley lithium + geothermal nexus.

The Salton Sea / Imperial Valley lithium-geothermal corridor is one of the most strategically important nexuses in US infrastructure — and it is still under-allocated by institutional capital.

What We WatchB/04

EDAM utility additions and LDES solicitation results.

Each EDAM addition reshapes western LMPs. Each LDES solicitation prints the curve for an emerging asset class.

Deliverables

What we ship on CAISO.

  • D/01CAISO Storage Dispatch & Ancillary Stack Pack
  • D/02LDES Procurement Tracker
  • D/03Imperial Valley Lithium-Geothermal Atlas
  • D/04EDAM Footprint Expansion Map

Audience

Who uses this read.

  • Battery storage developers
  • Long-duration storage technology providers
  • Western utilities considering EDAM
  • Hyperscalers in Bay Area / LA