MISO spans 15 states from the Dakotas to Louisiana. Reshoring, EV/battery manufacturing, and South region thermal retirements are driving the largest queue and the most consequential planning cycle in the country.
STRUCTURAL METRICS
LIVE-TRACKED
Footprint
15 US states + Manitoba
Peak Load
~127 GW
Queue Backlog
~370+ GW (mostly solar/storage)
LRTP Tranche 1+2
~$32B planned transmission
Reserve Margin
Tightening in MISO South
Constraint Map
Where the headroom is gone.
N/01
Critical
Indiana / Ohio Valley
EV battery + chip fab cluster; load growth outpacing transmission.
PJM/MISO and SPP/MISO seams creating curtailment and basis risk pockets.
Rule Changes & Filings
Recent and pending.
2022
LRTP Tranche 1 approved (~$10.3B)
Unlocks ~53 GW of generation interconnection capacity.
2024
LRTP Tranche 2 approved (~$22B)
Largest single-cycle transmission build in US history.
Ongoing
PRA seasonal construct
Capacity prices settling by season; risk profile shifts by zone.
Positioning
Why MISO matters now.
MISO is where industrial reshoring meets transmission scarcity. Tranche 2 of the Long Range Transmission Plan is the largest single-cycle build in US history — and it is already undersized against the load that battery, semiconductor, and steel announcements are putting on the system.
Buyer's Lens
How capital should read MISO.
Four angles we underwrite against, written for the people actually deploying.
OpportunityB/01
Siting moves with the LRTP lines.
Tranche 1 and 2 unlock developable acreage along specific corridors in Iowa, Minnesota, Indiana, and Louisiana. The acquirers positioning land along these corridors before the EIS milestones print are setting up a multi-year arbitrage.
RiskB/02
MISO South is capacity-import constrained.
Reserve margin compression in LA / MS / AR is no longer a planning footnote. Capacity import limits across the North-South interface mean that South-zone load growth without local generation is a reliability story that will become a price story.
Where Capital WinsB/03
Solar+storage hybrids in DPP queue clusters.
Storage co-location is now the dominant queue configuration. Projects with executed network upgrade commitments and DPP-cleared status carry premium acquisition value — particularly in zones with rising PRA prints.
What We WatchB/04
PRA seasonal prints and EV/battery siting announcements.
Seasonal PRA construct prices capacity by zone and season — creating asymmetric exposure that most underwriters still average through. We model the print before it lands.
Deliverables
What we ship on MISO.
D/01LRTP Corridor Land Atlas (Tranche 1+2)
D/02MISO South Reserve Margin Tracker
D/03DPP Cluster Status & Network Upgrade Cost Pack