PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026
SMStock & Milster

ISO/02 · Midwest & South-Central US

Midcontinent ISOMISO

The 15-state corridor for industrial reshoring.

LRTP Build

~$32B

Queue Backlog

~370 GW

South Reserve Margin

Tight

TERMINAL · ISO/02

Operational intelligence frame

LMP HEATMAP · $/MWh · 7D × 24H

MIN $14 · MAX $156
MONTUEWEDTHUFRISATSUN
0006121823
SCALE:LOWMIDELEVATEDSCARCITY

QUEUE AGING · GW

0–1y51 GW
1–2y76 GW
2–3y99 GW
3–5y124 GW
5y+98 GW

Median age: 3.4y · trending +0.6y YoY

TOP CONSTRAINED NODES · 24H

#
Node
LMP
Cong.
Headroom
Δ
1
DOM.WARRENTON
$42
99
29%
+1.5
2
AEP.LIVINGSTON
$39
35
16%
+3.8
3
COMD.JOLIET
$101
85
29%
+0.9
4
BGE.CALVERT
$66
19
1%
-1.1
5
PEPCO.BRANDYWINE
$85
58
14%
-0.7
6
PJM.BLACKOAK
$87
62
3%
+2.1

FERC DOCKET STREAM

ER26-12842026-05-09

Capacity auction parameter update

Tariff
ER26-11902026-05-02

Order 2023 queue reform compliance

Queue
ER26-11122026-04-24

RTEP transmission expansion proposal

Transmission
ER26-10412026-04-18

Affected systems study protocol revision

Process
EL26-08322026-04-09

Cost allocation complaint — load zone

Litigation

ILLUSTRATIVE TERMINAL VIEW · PRODUCTION FEEDS UNDER NDA · REFRESH 5 MIN

Read

MISO spans 15 states from the Dakotas to Louisiana. Reshoring, EV/battery manufacturing, and South region thermal retirements are driving the largest queue and the most consequential planning cycle in the country.

STRUCTURAL METRICS

LIVE-TRACKED
Footprint
15 US states + Manitoba
Peak Load
~127 GW
Queue Backlog
~370+ GW (mostly solar/storage)
LRTP Tranche 1+2
~$32B planned transmission
Reserve Margin
Tightening in MISO South

Constraint Map

Where the headroom is gone.

N/01

Critical

Indiana / Ohio Valley

EV battery + chip fab cluster; load growth outpacing transmission.

N/02

Critical

MISO South (LA / MS / AR)

Reserve margin compression; capacity import constrained.

N/03

Elevated

Wisconsin / Illinois border

Coal retirement gap meets Chicago metro load.

N/04

Elevated

Iowa / Minnesota

Wind-rich, transmission-bottlenecked; queue re-engineering ongoing.

Queue Dynamics

Interconnection truth.

Definitive Planning Phase backlog

Multi-cycle congestion

Storage co-location share

Rising rapidly

Thermal retirements

Elevated (coal-heavy footprint)

PRA price trajectory

Upward across zones

Themes

What we are watching.

T/01

LRTP build-out

Long Range Transmission Plan Tranches 1 & 2 unlock developable acreage; siting moves with the lines.

T/02

Industrial reshoring

Battery, semiconductor, and steel announcements colliding with reserve margin compression.

T/03

Storage as the new currency

Hybrid solar+storage configurations dominating queue economics.

T/04

Seam dynamics

PJM/MISO and SPP/MISO seams creating curtailment and basis risk pockets.

Rule Changes & Filings

Recent and pending.

2022

LRTP Tranche 1 approved (~$10.3B)

Unlocks ~53 GW of generation interconnection capacity.

2024

LRTP Tranche 2 approved (~$22B)

Largest single-cycle transmission build in US history.

Ongoing

PRA seasonal construct

Capacity prices settling by season; risk profile shifts by zone.

Positioning

Why MISO matters now.

MISO is where industrial reshoring meets transmission scarcity. Tranche 2 of the Long Range Transmission Plan is the largest single-cycle build in US history — and it is already undersized against the load that battery, semiconductor, and steel announcements are putting on the system.

Buyer's Lens

How capital should read MISO.

Four angles we underwrite against, written for the people actually deploying.
OpportunityB/01

Siting moves with the LRTP lines.

Tranche 1 and 2 unlock developable acreage along specific corridors in Iowa, Minnesota, Indiana, and Louisiana. The acquirers positioning land along these corridors before the EIS milestones print are setting up a multi-year arbitrage.

RiskB/02

MISO South is capacity-import constrained.

Reserve margin compression in LA / MS / AR is no longer a planning footnote. Capacity import limits across the North-South interface mean that South-zone load growth without local generation is a reliability story that will become a price story.

Where Capital WinsB/03

Solar+storage hybrids in DPP queue clusters.

Storage co-location is now the dominant queue configuration. Projects with executed network upgrade commitments and DPP-cleared status carry premium acquisition value — particularly in zones with rising PRA prints.

What We WatchB/04

PRA seasonal prints and EV/battery siting announcements.

Seasonal PRA construct prices capacity by zone and season — creating asymmetric exposure that most underwriters still average through. We model the print before it lands.

Deliverables

What we ship on MISO.

  • D/01LRTP Corridor Land Atlas (Tranche 1+2)
  • D/02MISO South Reserve Margin Tracker
  • D/03DPP Cluster Status & Network Upgrade Cost Pack
  • D/04Reshoring Announcement → Load Forecast Crosswalk

Audience

Who uses this read.

  • EV/battery manufacturers
  • Reshoring industrial siting
  • Solar+storage developers
  • Utilities filing IRPs

Engage

Position capital before the MISO cycle moves again.

Request MISO Intelligence Pack