Hyperscale · Cloud & AI
Google (Alphabet).
Google's infrastructure strategy leans on advanced nuclear (Kairos), geothermal (Fervo), and long-duration storage. Its footprint in the Midwest, Southeast, and CAISO is expanding, with acute grid constraints in Iowa and Tennessee.
HQ
Mountain View, CA
Ticker
NASDAQ: GOOGL
Employees
183,000
Market Cap
$2.1T
Institutional Scoring
Grid, power, opportunity
Grid Risk — Moderate
Composite risk index
- · BPA hydro constraint
- · MISO capacity accreditation
- · Duke coal retirement pace
Power Availability — Moderate
Firm delivery readiness
SMR + geothermal + LDS pipeline creates firm-power optionality beyond 2028.
Opportunity — High
Institutional thesis
Anchor customer for next-generation firm technologies — sets long-dated PPA benchmarks.
Analyst AI Summary
Google is the deepest pocket for advanced-technology firm power (SMR, geothermal, LDS). Iowa (Council Bluffs) and Tennessee (Kairos) are the two watch nodes. Constraint isn't capital — it's siting and interconnect. Watch: TVA SMR ROD and MidAmerican IRP filing.
Executive Hierarchy
Sundar Pichai
Since 2015
CEO, Alphabet & Google
AI capex, cloud
Anat Ashkenazi
Since 2024
CFO
Capex discipline
Amanda Peterson-Corio
Since 2020
Head of Global Data Center Energy
PPA + firm strategy
Michael Terrell
Since 2019
Head of Advanced Energy
Nuclear, geothermal, LDS
Recent News
- 2026-06-25 · ReutersCapex
Google + TVA sign Kairos SMR site development MoU
- 2026-06-12 · WSJCapex
Council Bluffs IA campus phase 4 approved
- 2026-05-04 · Alphabet IREarnings
Q1 capex $12B, FY26 guide $56B
Infrastructure Projects
| Project | Status | Capex | MW | State | Online |
|---|---|---|---|---|---|
| TVA Kairos SMR site (Clinch River) | Announced | TBD (PPA) | 500 | TN | 2032+ |
| Council Bluffs IA Phase 4 | Under Construction | $2.9B | 500 | IA | 2027 |
| Storey County NV Expansion | Under Construction | $2.1B | 400 | NV | 2027 |
| Dothan AL Campus | Permitting | $3.6B | 600 | AL | 2028 |
Facilities
| Facility | Type | Location | ISO | Utility | Load (MW) | Status |
|---|---|---|---|---|---|---|
| Council Bluffs Campus | Data Center | Council Bluffs, IA | MISO | MidAmerican Energy | 800 | Operational |
| Storey County NV | Data Center | Storey County, NV | WECC | NV Energy | 800 | Operational |
| The Dalles OR | Data Center | The Dalles, OR | WECC | Northern Wasco PUD | 300 | Operational |
| Lenoir NC | Data Center | Lenoir, NC | SERC | Duke Energy Carolinas | 300 | Operational |
| Mountain View HQ | Headquarters | Mountain View, CA | CAISO | PG&E | 42 | Operational |
Utilities Serving Facilities
MidAmerican Energy
Berkshire Hathaway Energy · serves Council Bluffs
IUB special contract
NV Energy
Berkshire Hathaway Energy · serves Storey County
Section 704B unbundled
Northern Wasco PUD
PUD / BPA wholesale · serves The Dalles
Firm — BPA constrained
Duke Energy Carolinas
Duke Energy · serves Lenoir
NC UC rider
Substations Nearby
S 34th St 345kV
MidAmerican · serves Council Bluffs
345 kV
1 mi
TRIC 230kV
NV Energy · serves Storey County
230 kV
0.6 mi
Big Eddy 500kV
BPA · serves The Dalles
500 kV
2.1 mi
Marion 500kV
Duke · serves Lenoir
500 kV
3.8 mi
Transmission Proximity
MISO 345kV IA loop
345 kV · 30 miMidAmerican / ITC · headroom 10%
One Nevada Transmission Line 500kV
500 kV · 235 miNV Energy · headroom 22%
Duke 500kV NC/SC
500 kV · 42 miDuke · headroom 8%
Capital Spending
2024A
AI + DC + fiber
$52B
2025A
AI capacity
$52B
2026E
AI + advanced nuclear pre-dev
$56B
Manufacturing Footprint
Mountain View, CA
TPU design
Headcount 2,700 · Capacity n/a
ESG Metrics
24/7 CFE regions
13 ▲
Renewable match
100% —
Water replenishment
40% ▲
Scope 3 emissions
11.5 Mt ▲
Energy Consumption Mix
Fervo Nevada
Kairos
Political Exposure
Iowa Utilities Board
ModerateData center rate design case
Tennessee Valley Authority
LowFederal jurisdiction, supportive
North Carolina UC
ModerateRate case timing
Natural Disaster Exposure
Wildfire
ElevatedNV + OR + CA HQ
Tornado
ElevatedIA + AL
Hurricane
ModerateAL + SC
Forward Timeline
- 2026-Q4
TVA Kairos MoU deliverables
Generation
- 2027-Q2
Council Bluffs phase 4 first power
Data Center
- 2027-Q4
Storey County expansion COD
Data Center
- 2028-Q3
Dothan AL phase 1 first power
Data Center
Relationship Mapping
TVA
UtilityKairos SMR site host
MidAmerican Energy
UtilityCouncil Bluffs supplier
Duke Energy
UtilityLenoir supplier
Kairos Power
SupplierSMR technology partner
Fervo Energy
SupplierGeothermal PPA anchor
Amazon, Microsoft, Meta
CompetitorSame substations
Recent SEC Filings
10-Q
2026-04-29Q1 — capex $12B, FY26 guide reaffirmed
8-K
2026-06-25TVA Kairos MoU
Procurement Contacts
Global Infrastructure Procurement
Data center + fiber
Long-lead + advanced nuclear
Advanced Energy Team
SMR + geothermal + LDS
Emerging tech PPAs
Recent Press Releases
Google and TVA Advance Kairos SMR Development
2026-06-25Capex
Google Expands Council Bluffs Campus
2026-06-12Capex