ISO / RTO · MODELED TAPE
PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026
SMStock & Milster

Regulated Utility · PJM/Dominion Zone

Dominion Energy.

Dominion sits at the epicenter of PJM's capacity crisis: 25+ GW of data center pipeline in its territory, transmission upgrades that trail load by 3–5 years, and an IRP that pulled forward gas capacity twice in 18 months.

HQ

Richmond, VA

Ticker

NYSE: D

Employees

17,000

Market Cap

$48B

Institutional Scoring

Grid, power, opportunity

Grid Risk — Elevated

82/ 100

Composite risk index

  • · Loudoun 500kV headroom < 5%
  • · Queue-driven upgrade slippage
  • · Summer capacity deficit 2027–2029

Power Availability — Constrained

38/ 100

Firm delivery readiness

Firm delivery in Loudoun/PW effectively unavailable pre-2028 without BTM or curtailment agreement.

Opportunity — High

74/ 100

Institutional thesis

Regulated capex trajectory ($40B+ five-year) with load-driven rate base expansion — asymmetric to authorized ROE.

Analyst AI Summary

Dominion is the single most systemically important utility to the U.S. AI buildout. Every hyperscaler siting decision in the mid-Atlantic passes through its interconnection queue. Near-term risk: transmission slip in Loudoun forces load curtailment or BTM gas. Long-term risk: rate design fight over who pays for DC-driven upgrades. Watch: 2026 SCC ruling on Rider T2 and the CVOW Phase II construction milestones.

Executive Hierarchy

Robert Blue

Since 2020

Chair, President & CEO

Regulatory strategy, capital allocation

Steven Ridge

Since 2023

EVP & CFO

Capex plan, rate case posture

Diane Leopold

Since 2020

EVP & COO

Grid ops, generation portfolio

Ed Baine

Since 2020

President, Dominion Energy Virginia

Data center interconnection queue

Carlos Brown

Since 2019

EVP, General Counsel

FERC, Virginia SCC filings

Recent News

  • 2026-06-24 · ReutersRegulatory

    Dominion files updated 2026 IRP; adds 5.9 GW gas by 2032

  • 2026-06-11 · S&P GlobalRegulatory

    Virginia SCC approves $2.1B transmission cost recovery rider

  • 2026-05-28 · BloombergPolicy

    Amazon, Microsoft protest DC-specific tariff proposal

  • 2026-05-14 · Dominion IREarnings

    Q1 2026 earnings — Virginia data center load +14% YoY

  • 2026-04-30 · Utility DiveOperations

    Loudoun 500kV upgrade slips to Q3 2028

Infrastructure Projects

ProjectStatusCapexMWStateOnline
Chesterfield Energy Reliability Center (CT)Permitting$1.6B1,000VA2029
Offshore Wind CVOW Phase IIUnder Construction$9.8B2,600VA2027
Loudoun 500kV Ring ReinforcementPermitting$1.4B—VA2028
North Anna 3 SMR (pre-app)AnnouncedTBD300VA2034+
Surry–Skiffes Creek 500kV RebuildUnder Construction$680M—VA2027

Facilities

FacilityTypeLocationISOUtilityLoad (MW)Status
Ladysmith Substation ZoneSubstationCaroline County, VAPJMDominion Virginia2,400Operational
North Anna NuclearPower PlantLouisa County, VAPJMDominion1,892Operational
Chesterfield Power StationPower PlantChester, VAPJMDominion1,244Operational
Greensville County CTPower PlantGreensville, VAPJMDominion1,588Operational
Corporate HQHeadquartersRichmond, VAPJMDominion12Operational

Utilities Serving Facilities

  • Dominion Energy Virginia

    Dominion Energy Inc. · serves Loudoun DC Cluster (customer-served)

    Schedule GS-4 · under review

  • Dominion Energy Virginia

    Dominion Energy Inc. · serves Prince William Digital Gateway

    Provisional interconnect

  • Dominion Energy Virginia

    Dominion Energy Inc. · serves Surry Peninsula Load

    Rider T1 approved

Substations Nearby

  • Brambleton 500/230kV

    Dominion · serves Loudoun DC ring

    500/230 kV

    0.4 mi

  • Yardley Ridge 230kV

    Dominion · serves Ashburn campus

    230 kV

    1.1 mi

  • Poland Road 500kV

    Dominion · serves Digital Gateway (proposed)

    500 kV

    2.3 mi

  • Morrisville 500kV

    Dominion · serves Manassas load pocket

    500 kV

    3.8 mi

Transmission Proximity

  • Mt. Storm–Doubs 500kV

    500 kV · 22 mi

    Dominion / FirstEnergy · headroom ≤ 4% summer peak

  • Cunningham–Elmont 500kV

    500 kV · 14 mi

    Dominion · headroom 8% shoulder

  • Surry–Skiffes Creek 500kV (rebuild)

    500 kV · 8 mi

    Dominion · headroom post-2027 uplift

Capital Spending

  • 2024A

    Transmission, offshore wind, DC interconnect

    $5.1B

  • 2025A

    CVOW, Loudoun 500kV

    $6.4B

  • 2026E

    Firm capacity, transmission rebuild

    $7.9B

  • 2027E

    Chesterfield CT, DC substations

    $8.6B

  • 2028E

    SMR pre-development, storage

    $8.2B

Manufacturing Footprint

  • Norfolk, VA

    CVOW monopile staging

    Headcount 410 · Capacity 176 turbines

ESG Metrics

  • Scope 1 emissions

    36.4 Mt CO₂e ▼

  • Renewable share

    22% ▲

  • Methane intensity

    0.11% ▼

  • Coal capacity

    1.9 GW ▼

Energy Consumption Mix

Nuclear30%
Gas41%
Renewables22%

solar + CVOW ramp

Coal5%

retire by 2030

Purchased2%

Political Exposure

  • Virginia General Assembly

    Elevated

    Data center tax + rate design bills (HB 909, SB 522)

  • Loudoun County

    High

    Overhead line moratorium petitions

  • Prince William County

    High

    Digital Gateway litigation ongoing

  • FERC

    Moderate

    Order 1920 compliance filings due Q3 2026

Natural Disaster Exposure

  • Hurricane / coastal surge

    Elevated

    Hampton Roads, CVOW landfall

  • Ice storm

    Moderate

    Shenandoah, western VA

  • Wildfire

    Low

    n/a

  • Riverine flood

    Moderate

    James River basin plants

Forward Timeline

  1. 2026-Q3

    SCC Rider T2 order

    Regulatory

  2. 2026-Q4

    CVOW Phase II monopile install season

    Capex

  3. 2027-Q2

    Surry–Skiffes rebuild in-service

    Transmission

  4. 2027-Q4

    CVOW first power

    Generation

  5. 2028-Q3

    Loudoun 500kV ring energized

    Transmission

  6. 2029-Q4

    Chesterfield CT COD

    Generation

Relationship Mapping

  • Largest single load in Loudoun

  • Microsoft Customer

    Prince William + Mecklenburg campuses

  • Capacity + transmission planning

  • Virginia SCC

    Regulator

    Rate + IRP jurisdiction

  • Siemens Energy

    Supplier

    CT + transformer OEM

  • Ørsted / Eversource

    Partner

    Offshore wind reference

Recent SEC Filings

  • 10-Q

    2026-05-08

    Q1 2026 — Virginia sales +14% YoY, capex plan reaffirmed $43B/5yr

  • 8-K

    2026-06-24

    IRP 2026 update filed with VA SCC

  • S-3

    2026-04-11

    $4.5B mixed shelf registration

  • DEF 14A

    2026-03-14

    Proxy — executive comp, board refresh

Procurement Contacts

  • Procurement Operations

    Supply Chain Center — Richmond

    Transformers, switchgear, HV cable

  • Renewable Development Sourcing

    CVOW + solar package awards

    EPC, marshalling, marine

  • Data Center Interconnection Desk

    Large-load intake

    Substation build, service agreements

Recent Press Releases

  • Dominion Energy Files 2026 Integrated Resource Plan

    2026-06-24

    Regulatory

  • CVOW Monopile Installation Reaches 70 Turbines

    2026-06-02

    Operations

  • Dominion Reports First-Quarter 2026 Financial Results

    2026-05-14

    Earnings

  • Dominion Publishes 2025 Sustainability & Climate Report

    2026-04-22

    ESG