PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026
SMStock & Milster

Quarterly Brief · Q1 2026 · 18 MIN READ

State of Grid Capacity — Q1 2026

AI compute, industrial reshoring, and electrification have collapsed slack across PJM, MISO, and ERCOT. The constraint is no longer capital — it is power.

A. Morgan

Director · Sentiment & Stakeholder Intelligence

Previously: regulated utility regulatory affairs

Q1 2026 · 18 min read

PJMMISOERCOTCapacityAI Load

Executive Summary

Across the four largest US ISOs, available transmission capacity has tightened to multi-decade lows. PJM's 2025/26 Base Residual Auction print of $269.92/MW-day represents a >9x year-over-year capacity price increase and is the clearest market signal that the structural supply-demand balance has reversed.

MISO's LRTP Tranches 1 and 2 — combined ~$32B in transmission build-out — represent the largest single planning cycle in US history and are tracking against load growth that arrived faster than the planning cycle assumed.

PJM: Capacity as the New Currency

Northern Virginia's data center load growth has effectively absorbed the deliverability headroom in the eastern PJM zones. New large load asks are facing 4–7 year energization realities even where utility marketing materials reference shorter timelines.

Behind-the-meter co-location with existing nuclear and gas assets has become the highest-velocity path to power for hyperscale workloads — and the FERC posture on those structures will set the next 24 months of dealflow architecture.

MISO: Reshoring Meets Reserve Margin

EV / battery / semiconductor announcements concentrated in Indiana, Ohio, and Tennessee are colliding with reserve margin compression in MISO South. The Definitive Planning Phase queue continues to skew heavily toward hybrid solar + storage configurations.

Seam dynamics with PJM and SPP are generating curtailment and basis risk pockets that materially affect PPA structuring.

ERCOT: The Large Flexible Load Era

Texas's HB 5066 / SB 6 framework introduces the first formal regulatory category for large flexible loads. Permian Basin transmission planning under the PUCT remains the most consequential infrastructure decision in the state's grid history.

Energy-only market design continues to produce the most active battery dispatch market in North America — the Performance Credit Mechanism debate is the open question for generator economics.

Key Takeaways

  • 01Capacity scarcity is structural, not cyclical. Underwriting models built on pre-2024 BRA assumptions need full refresh.
  • 02Behind-the-meter co-location is reshaping the architecture of hyperscale dealflow.
  • 03MISO LRTP Tranche 2 unlocks meaningful new developable acreage — but on a 5–8 year construction horizon.
  • 04ERCOT remains the fastest path to power for compatible workloads, with regulatory framework risk to monitor.

Discuss the implications for your platform.