PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026PJMDEM98.4GWFCST104.2GW+5.8LMP$49.36CONG$11.6●RES15.8%●TX8●MIXSrc: · · Upd Oct 10, 2026MISODEM76.5GWFCST84.9GW+8.4LMP$39.82CONG$18.7●RES17.4%●TX10●MIXSrc: · · Upd Oct 10, 2026ERCOTDEM58.9GWFCST66.1GW+7.2LMP$41.20CONG$9.8●RES7.6%●TX12●MIXSrc: · · Upd Oct 10, 2026SPPDEM31.7GWFCST36.2GW+4.5LMP$33.15CONG$6.4●RES21.6%●TX5●MIXSrc: · · Upd Oct 10, 2026CAISODEM27.2GWFCST33.5GW+6.3LMP$63.20CONG$13.9●RES11.4%●TX7●MIXSrc: · · Upd Oct 10, 2026NYISODEM16.1GWFCST19.0GW+2.9LMP$68.40CONG$10.3●RES14.1%●TX4●MIXSrc: · · Upd Oct 10, 2026ISO-NEDEM12.8GWFCST15.4GW+2.6LMP$57.10CONG$7.9●RES17.2%●TX3●MIXSrc: · · Upd Oct 10, 2026
SMStock & Milster

White Paper · 2026 · 24 MIN READ

Co-Location Architecture: Behind-the-Meter Power for Hyperscale AI

Why FERC's posture on behind-the-meter co-location with existing generation is the single most important structural question for hyperscale siting in 2026.

A. Morgan

Director · Sentiment & Stakeholder Intelligence

Previously: regulated utility regulatory affairs

2026 · 24 min read

HyperscalersFERCBehind-the-MeterNuclear

The Premise

Hyperscale AI workloads need power on a 12–24 month horizon. Conventional interconnection delivers it on a 4–7 year horizon. Co-location with existing baseload generation closes the gap — if the regulatory architecture allows it.

The Talen / Susquehanna ISA filing has become the proxy fight that will determine the shape of the next 36 months of hyperscale dealflow.

Three Structural Models

1) Pure behind-the-meter — load served entirely from co-located generation, no grid charges. Simplest architecturally; most regulatorily contested.

2) Hybrid co-location — primary supply behind-the-meter with grid backup; cost-allocation questions remain open.

3) Front-of-meter PPA proximity — load takes service from grid but locates adjacent to generation; lowest regulatory risk, highest grid-charge exposure.

What to Watch

FERC's substantive ruling in the Talen/AWS proceeding (and follow-ons) will set the template.

PJM's evolving capacity treatment of co-located load.

State PUC posture on retail vs. wholesale jurisdiction at the meter.

Key Takeaways

  • 01Co-location is the fastest path to hyperscale power — and the most regulatorily contested.
  • 02Architecture choice is now a primary deal variable, not a back-office structuring detail.
  • 03Funds underwriting hyperscale infrastructure need a defensible read on FERC trajectory.